Search results

(1 - 20 of 58)

Pages

The hallway of the Main Building located on the first floor
The Little Theater in the Main Building
Windows in the Main Building
The E  Building staircase in the center of the floors during construction
Construction of the Little Theater in the Main Building
Machi Versano 10
Raymond Schoenberg
Students on the roof area of the M Building
President Joseph Shenker and NYS Comptroller Harrison Golden Inspecting Construction Project
Construction of the E Building - June 22, 1990
Main Building - Joseph Shenker Hall Dedication
Equitable Bag Building Prior to Renovation as New E Building
Perspective, 1975 July
Perspective, 1973 June
Dean Martin Moed at E Building Ground Breaking Ceremony

Pages