Search results

(1 - 20 of 57)

Pages

Inside the Main Building - first floor
Windows in the Main Building
The original Main Building during construction
The Great Hall located in the original Main Building
Students standing in front of the Main Building of the college
Students on the roof area of the M Building
President Joseph Shenker and NYS Comptroller Harrison Golden Inspecting Construction Project
Dean Martin Moed at E Building Ground Breaking Ceremony
Construction of the E Building May 9 and 22, 1989
Construction of the E Building - June 22, 1990
Construction of the E Building
African-America Literature Marathon - February 1976
Students in the cafeteria in the M Building
Students in The Great Hall in the Main Building
A student with a baby
Students in the corridor of the Main Building which became The Hall of Flags
Construction of the E Building
Main Entrance of the Original  M Building
Equitable Bag Building Prior to Renovation as New E Building
Main Building - Joseph Shenker Hall Dedication

Pages